Project: (820180190)
Folder
Document Type
Date
Ver.
File Name
Approved Drawings
Approved Drawings
Approved Site Plan Drawing
5/4/2020
5
07-SITE-820180190-SP-100.pdf
Approved Drawings
Approved Site Plan Drawing
5/4/2020
5
07-SITE-820180190-SP-100A.pdf
Approved Drawings
Approved Site Plan Drawing
5/4/2020
5
07-SITE-820180190-SP-100B.pdf
Approved Drawings
Approved Site Plan Drawing
5/4/2020
5
07-SITE-820180190-SP-100C.pdf
Approved Drawings
Approved Site Plan Drawing
5/4/2020
5
07-SITE-820180190-SP-100D.pdf
Approved Drawings
Approved Site Plan Drawing
5/4/2020
5
07-SITE-820180190-SP-100E.pdf
Approved Drawings
Approved Site Plan Drawing
5/4/2020
4
07-SITE-820180190-SP-100F.pdf
Approved Drawings
Approved Site Plan Drawing
5/4/2020
5
07-SITE-820180190-SP-101.pdf
Approved Drawings
Approved Site Plan Drawing
5/4/2020
5
07-SITE-820180190-SP-102.pdf
Approved Drawings
Approved Site Plan Drawing
5/4/2020
5
07-SITE-820180190-SP-103.pdf
Approved Drawings
Approved Site Plan Drawing
5/4/2020
5
07-SITE-820180190-SP-104.pdf
Approved Drawings
Approved Site Plan Drawing
5/4/2020
5
07-SITE-820180190-SP-105.pdf
Approved Drawings
Approved Site Plan Drawing
5/4/2020
5
07-SITE-820180190-SP-401.pdf
Approved Drawings
Approved Site Plan Drawing
5/4/2020
5
07-SITE-820180190-SP-402.pdf
Approved Drawings
Approved Site Plan Drawing
5/4/2020
5
07-SITE-820180190-SP-403.pdf
Approved Drawings
Approved Site Plan Drawing
5/4/2020
4
07-SITE-820180190-SP-404.pdf
Approved Drawings
Approved Site Plan Drawing
5/4/2020
4
07-SITE-820180190-SP-405.pdf
Approved Drawings
Approved Site Plan Drawing
5/4/2020
5
07-SITE-820180190-SP-411.pdf
Approved Drawings
Approved Site Plan Drawing
5/4/2020
5
07-SITE-820180190-SP-412.pdf
Approved Drawings
Approved Site Plan Drawing
5/4/2020
5
07-SITE-820180190-SP-413.pdf
Approved Drawings
Approved Site Plan Drawing
5/4/2020
5
07-SITE-820180190-SP-501.pdf
Approved Drawings
Approved Site Plan Drawing
5/4/2020
5
07-SITE-820180190-SP-502.pdf
Approved Drawings
Approved Landscape and Lighting Plan Drawing
5/4/2020
6
08-LL-820180190-L1-001.pdf
Approved Drawings
Approved Landscape and Lighting Plan Drawing
5/4/2020
6
08-LL-820180190-L1-002.pdf
Approved Drawings
Approved Landscape and Lighting Plan Drawing
5/4/2020
5
08-LL-820180190-L2-101.pdf
Approved Drawings
Approved Landscape and Lighting Plan Drawing
5/4/2020
6
08-LL-820180190-L2-102.pdf
Approved Drawings
Approved Landscape and Lighting Plan Drawing
5/4/2020
5
08-LL-820180190-L4-001.pdf
Approved Drawings
Approved Landscape and Lighting Plan Drawing
5/4/2020
5
08-LL-820180190-L4-101.pdf
Approved Drawings
Approved Landscape and Lighting Plan Drawing
5/4/2020
5
08-LL-820180190-L4-201.pdf
Approved Drawings
Approved Landscape and Lighting Plan Drawing
5/4/2020
5
08-LL-820180190-L4-301.pdf
Approved Drawings
Approved Landscape and Lighting Plan Drawing
5/4/2020
5
08-LL-820180190-L5-101.pdf
Approved Drawings
Approved Landscape and Lighting Plan Drawing
5/4/2020
6
08-LL-820180190-L5-102.pdf
Approved Drawings
Approved Landscape and Lighting Plan Drawing
5/4/2020
5
08-LL-820180190-L6-101.pdf
Approved Drawings
Approved Landscape and Lighting Plan Drawing
5/4/2020
5
08-LL-820180190-L6-301.pdf
Approved Drawings
Approved Landscape and Lighting Plan Drawing
5/4/2020
6
08-LL-820180190-SL3.0.pdf
Approved Drawings
Approved Landscape and Lighting Plan Drawing
5/4/2020
5
08-LL-820180190-SL3.1.pdf
Approved Drawings
Approved Landscape and Lighting Plan Drawing
5/4/2020
5
08-LL-820180190-SL3.2.pdf
Approved Drawings
Approved Landscape and Lighting Plan Drawing
5/4/2020
4
08-LL-820180190-SL3.3.pdf
Approved Drawings
Approved Landscape and Lighting Plan Drawing
5/4/2020
4
08-LL-820180190-SL3.4.pdf
Approved Drawings
Approved Architectural Drawing
5/4/2020
6
09-ARCH-820180190-A101.pdf
Approved Drawings
Approved Architectural Drawing
5/4/2020
6
09-ARCH-820180190-A102.pdf
Approved Drawings
Approved Architectural Drawing
5/4/2020
5
09-ARCH-820180190-A103.pdf
Approved Drawings
Approved Architectural Drawing
5/4/2020
5
09-ARCH-820180190-A104.pdf
Approved Drawings
Approved Architectural Drawing
5/4/2020
5
09-ARCH-820180190-A201.pdf
Approved Drawings
Approved Architectural Drawing
5/4/2020
5
09-ARCH-820180190-A202.pdf
Approved Drawings
Approved Architectural Drawing
5/4/2020
5
09-ARCH-820180190-A203.pdf
Approved Drawings
Approved Architectural Drawing
5/4/2020
5
09-ARCH-820180190-A204.pdf
Approved Drawings
Approved Architectural Drawing
5/4/2020
5
09-ARCH-820180190-A205.pdf
Approved Drawings
Approved Architectural Drawing
5/4/2020
4
09-ARCH-820180190-A300.pdf
Approved Drawings
Approved Architectural Drawing
5/4/2020
4
09-ARCH-820180190-A301.pdf
Approved Drawings
Approved Architectural Drawing
5/4/2020
4
09-ARCH-820180190-A302.pdf
Approved Drawings
Approved Architectural Drawing
5/4/2020
4
09-ARCH-820180190-A303.pdf
Approved Drawings
Approved Architectural Drawing
5/4/2020
4
09-ARCH-820180190-A310.pdf
Approved Drawings
Approved Architectural Drawing
5/4/2020
4
09-ARCH-820180190-A311.pdf
Approved Drawings
Approved Architectural Drawing
5/4/2020
4
09-ARCH-820180190-A312.pdf
Approved Drawings
Approved Architectural Drawing
5/4/2020
4
09-ARCH-820180190-A313.pdf
Approved Drawings
Approved Architectural Drawing
5/4/2020
4
09-ARCH-820180190-A314.pdf
Approved Drawings
Approved Architectural Drawing
5/4/2020
4
09-ARCH-820180190-A315.pdf
Approved Drawings
Approved Architectural Drawing
5/4/2020
4
09-ARCH-820180190-A316.pdf
Approved Drawings
Approved Architectural Drawing
5/4/2020
4
09-ARCH-820180190-A317.pdf
Approved Drawings
Approved Architectural Drawing
5/4/2020
4
09-ARCH-820180190-A318.pdf
Approved Drawings
Approved Architectural Drawing
5/4/2020
4
09-ARCH-820180190-A319.pdf
Approved Drawings
Approved Architectural Drawing
5/4/2020
4
09-ARCH-820180190-A320.pdf
Approved Drawings
Approved Architectural Drawing
5/4/2020
4
09-ARCH-820180190-A321.pdf
Approved Drawings
Approved Architectural Drawing
5/4/2020
4
09-ARCH-820180190-A322.pdf
Approved Drawings
Forest Conservation Plan Drawing
5/4/2020
6
10-FCP-820180190-FCP-1.pdf
Approved Drawings
Forest Conservation Plan Drawing
5/4/2020
6
10-FCP-820180190-FCP-2.pdf
Approved Drawings
Forest Conservation Plan Drawing
5/4/2020
4
10-FCP-820180190-FCP-3.pdf
Approved Drawings
Forest Conservation Plan Drawing
5/4/2020
4
10-FCP-820180190-TS-1.pdf
Approved Drawings
Forest Conservation Plan Drawing
5/4/2020
4
10-FCP-820180190-TS-2.pdf
Approved Drawings
Forest Conservation Plan Drawing
5/4/2020
4
10-FCP-820180190-TS-3.pdf
Approved Drawings
Forest Conservation Plan Drawing
5/4/2020
4
10-FCP-820180190-TS-4.pdf
Approved Drawings
Forest Conservation Plan Drawing
5/4/2020
4
10-FCP-820180190-TS-5.pdf
Approved Drawings
Forest Conservation Plan Drawing
5/4/2020
4
10-FCP-820180190-TS-6.pdf
Post-Approval Documents
Post-Approval Documents
Planning Board Resolution
5/6/2019
1
30-PBRESandMailingLists- 820180190.pdf
Post-Approval Documents
Additional Item
9/9/2024
2
32-MPDU-820180190.pdf
Post-Approval Documents
Other Document
6/17/2021
1
33-SURETY_Site-820180190.pdf
Post-Approval Documents
Other Document
7/6/2021
1
36-FBCOC24_Revised_Recorded-820180190.pdf
Post-Approval Documents
Other Document
6/1/2021
1
36-FBCOC24_Revised_Unrecorded- 820180190.pdf
Board/Hearing Documents
Board/Hearing Documents
Notice of Public Hearing
3/1/2019
1
32 - NOPHandMailinglist - 820180190 & 120170170.pdf
Board/Hearing Documents
Staff Report
3/8/2019
1
32-SR-820180190.pdf
Board/Hearing Documents
Staff Report - Consent Agenda Item
1/29/2019
1
32-SRConsent_2ndExtension-820180190.pdf
Board/Hearing Documents
Staff Report - Consent Agenda Item
10/2/2018
1
32-SRConsent_Extension-820180190.pdf
Board/Hearing Documents
Additional Item
4/29/2019
2
32-StaffExhibit_PowerPoint-820180190.pdf
Submitted Drawings-Initial
Submitted Drawings-Initial
Submitted Site Plan Drawing
5/14/2018
3
07-SITE-820180190-SP-100.pdf
Submitted Drawings-Initial
Submitted Site Plan Drawing
5/11/2018
1
07-SITE-820180190-SP-100A.pdf
Submitted Drawings-Initial
Submitted Site Plan Drawing
5/11/2018
2
07-SITE-820180190-SP-101.pdf
Submitted Drawings-Initial
Submitted Site Plan Drawing
5/11/2018
2
07-SITE-820180190-SP-102.pdf
Submitted Drawings-Initial
Submitted Site Plan Drawing
5/11/2018
2
07-SITE-820180190-SP-103.pdf
Submitted Drawings-Initial
Submitted Site Plan Drawing
9/19/2018
1
07-SITE-820180190-SP-104.pdf
Submitted Drawings-Initial
Submitted Site Plan Drawing
9/19/2018
1
07-SITE-820180190-SP-105.pdf
Submitted Drawings-Initial
Submitted Site Plan Drawing
5/11/2018
2
07-SITE-820180190-SP-401.pdf
Submitted Drawings-Initial
Submitted Site Plan Drawing
5/11/2018
1
07-SITE-820180190-SP-402.pdf
Submitted Drawings-Initial
Submitted Site Plan Drawing
12/11/2018
1
07-SITE-820180190-SP-403.pdf
Submitted Drawings-Initial
Submitted Site Plan Drawing
10/9/2018
2
07-SITE-820180190-SP-411.pdf
Submitted Drawings-Initial
Submitted Site Plan Drawing
10/9/2018
2
07-SITE-820180190-SP-412.pdf
Submitted Drawings-Initial
Submitted Site Plan Drawing
10/9/2018
2
07-SITE-820180190-SP-413.pdf
Submitted Drawings-Initial
Submitted Site Plan Drawing
5/11/2018
2
07-SITE-820180190-SP-501.pdf
Submitted Drawings-Initial
Submitted Site Plan Drawing
5/11/2018
2
07-SITE-820180190-SP-502.pdf
Submitted Drawings-Initial
Submitted Site Plan Drawing
5/11/2018
1
07-SITE-820180190-SP-503.pdf
Submitted Drawings-Initial
Submitted Landscape and Lighting Plan Drawing
5/11/2018
2
08-LL-820180190-L1-001.pdf
Submitted Drawings-Initial
Submitted Landscape and Lighting Plan Drawing
1/14/2019
1
08-LL-820180190-L1-002.pdf
Submitted Drawings-Initial
Submitted Landscape and Lighting Plan Drawing
5/11/2018
2
08-LL-820180190-L2-101.pdf
Submitted Drawings-Initial
Submitted Landscape and Lighting Plan Drawing
5/11/2018
2
08-LL-820180190-L2-102.pdf
Submitted Drawings-Initial
Submitted Landscape and Lighting Plan Drawing
5/11/2018
2
08-LL-820180190-L4-001.pdf
Submitted Drawings-Initial
Submitted Landscape and Lighting Plan Drawing
5/11/2018
2
08-LL-820180190-L4-101.pdf
Submitted Drawings-Initial
Submitted Landscape and Lighting Plan Drawing
5/11/2018
2
08-LL-820180190-L4-102.pdf
Submitted Drawings-Initial
Submitted Landscape and Lighting Plan Drawing
1/14/2019
1
08-LL-820180190-L4-201.pdf
Submitted Drawings-Initial
Submitted Landscape and Lighting Plan Drawing
5/11/2018
2
08-LL-820180190-L4-301.pdf
Submitted Drawings-Initial
Submitted Landscape and Lighting Plan Drawing
5/11/2018
2
08-LL-820180190-L5-101.pdf
Submitted Drawings-Initial
Submitted Landscape and Lighting Plan Drawing
5/11/2018
2
08-LL-820180190-L5-102.pdf
Submitted Drawings-Initial
Submitted Landscape and Lighting Plan Drawing
5/11/2018
2
08-LL-820180190-L6-101.pdf
Submitted Drawings-Initial
Submitted Landscape and Lighting Plan Drawing
5/11/2018
2
08-LL-820180190-L6-301.pdf
Submitted Drawings-Initial
Submitted Landscape and Lighting Plan Drawing
9/19/2018
1
08-LL-820180190-PI.pdf
Submitted Drawings-Initial
Submitted Landscape and Lighting Plan Drawing
5/11/2018
2
08-LL-820180190-SL3.0.pdf
Submitted Drawings-Initial
Submitted Landscape and Lighting Plan Drawing
5/11/2018
2
08-LL-820180190-SL3.1.pdf
Submitted Drawings-Initial
Submitted Landscape and Lighting Plan Drawing
5/11/2018
1
08-LL-820180190-SL3.2.pdf
Submitted Drawings-Initial
Submitted Landscape and Lighting Plan Drawing
4/20/2018
1
08-LL-820180190-SL3.3.pdf
Submitted Drawings-Initial
Submitted Architectural Drawing
5/11/2018
2
09-ARCH-820180190-A101.pdf
Submitted Drawings-Initial
Submitted Architectural Drawing
5/11/2018
2
09-ARCH-820180190-A102.pdf
Submitted Drawings-Initial
Submitted Architectural Drawing
5/11/2018
2
09-ARCH-820180190-A103.pdf
Submitted Drawings-Initial
Submitted Architectural Drawing
5/11/2018
2
09-ARCH-820180190-A104.pdf
Submitted Drawings-Initial
Submitted Architectural Drawing
5/11/2018
2
09-ARCH-820180190-A201.pdf
Submitted Drawings-Initial
Submitted Architectural Drawing
5/11/2018
2
09-ARCH-820180190-A202.pdf
Submitted Drawings-Initial
Submitted Architectural Drawing
5/11/2018
2
09-ARCH-820180190-A203.pdf
Submitted Drawings-Initial
Submitted Architectural Drawing
5/11/2018
2
09-ARCH-820180190-A204.pdf
Submitted Drawings-Initial
Submitted Architectural Drawing
5/11/2018
2
09-ARCH-820180190-A205.pdf
Submitted Drawings-Initial
Submitted Architectural Drawing
5/11/2018
2
09-ARCH-820180190-A300.pdf
Submitted Drawings-Initial
Submitted Architectural Drawing
5/11/2018
2
09-ARCH-820180190-A301.pdf
Submitted Drawings-Initial
Submitted Architectural Drawing
5/11/2018
2
09-ARCH-820180190-A302.pdf
Submitted Drawings-Initial
Submitted Architectural Drawing
5/11/2018
2
09-ARCH-820180190-A303.pdf
Submitted Drawings-Initial
Submitted Architectural Drawing
9/19/2018
1
09-ARCH-820180190-A310.pdf
Submitted Drawings-Initial
Submitted Architectural Drawing
9/19/2018
1
09-ARCH-820180190-A311.pdf
Submitted Drawings-Initial
Submitted Architectural Drawing
9/19/2018
1
09-ARCH-820180190-A312.pdf
Submitted Drawings-Initial
Submitted Architectural Drawing
9/19/2018
1
09-ARCH-820180190-A313.pdf
Submitted Drawings-Initial
Submitted Architectural Drawing
9/19/2018
1
09-ARCH-820180190-A314.pdf
Submitted Drawings-Initial
Submitted Architectural Drawing
9/19/2018
1
09-ARCH-820180190-A315.pdf
Submitted Drawings-Initial
Submitted Architectural Drawing
9/19/2018
1
09-ARCH-820180190-A316.pdf
Submitted Drawings-Initial
Submitted Architectural Drawing
9/19/2018
1
09-ARCH-820180190-A317.pdf
Submitted Drawings-Initial
Submitted Architectural Drawing
9/19/2018
1
09-ARCH-820180190-A318.pdf
Submitted Drawings-Initial
Submitted Architectural Drawing
9/19/2018
1
09-ARCH-820180190-A319.pdf
Submitted Drawings-Initial
Submitted Architectural Drawing
9/19/2018
1
09-ARCH-820180190-A320.pdf
Submitted Drawings-Initial
Submitted Architectural Drawing
9/19/2018
1
09-ARCH-820180190-A321.pdf
Submitted Drawings-Initial
Submitted Architectural Drawing
1/14/2019
1
09-ARCH-820180190-A322.pdf
Submitted Drawings-Initial
Submitted Forest Conservation Plan Drawing
5/14/2018
2
10-FCP-820180190-FCP-1.pdf
Submitted Drawings-Initial
Submitted Forest Conservation Plan Drawing
5/14/2018
2
10-FCP-820180190-FCP-2.pdf
Submitted Drawings-Initial
Submitted Forest Conservation Plan Drawing
10/8/2018
2
10-FCP-820180190-FCP-3.pdf
Submitted Drawings-Final Revision
Submitted Drawings-Final Revision
Site Plan Drawing (Final Version)
6/15/2018
4
07-SITE-820180190-SP-100.pdf
Submitted Drawings-Final Revision
Site Plan Drawing (Final Version)
10/9/2018
7
07-SITE-820180190-SP-100.pdf
Submitted Drawings-Final Revision
Site Plan Drawing (Final Version)
12/11/2018
8
07-SITE-820180190-SP-100.pdf
Submitted Drawings-Final Revision
Site Plan Drawing (Final Version)
1/14/2019
9
07-SITE-820180190-SP-100.pdf
Submitted Drawings-Final Revision
Site Plan Drawing (Final Version)
9/19/2018
2
07-SITE-820180190-SP-100A.pdf
Submitted Drawings-Final Revision
Site Plan Drawing (Final Version)
12/11/2018
6
07-SITE-820180190-SP-101.pdf
Submitted Drawings-Final Revision
Site Plan Drawing (Final Version)
10/9/2018
5
07-SITE-820180190-SP-101.pdf
Submitted Drawings-Final Revision
Site Plan Drawing (Final Version)
6/15/2018
3
07-SITE-820180190-SP-101.pdf
Submitted Drawings-Final Revision
Site Plan Drawing (Final Version)
1/14/2019
7
07-SITE-820180190-SP-101.pdf
Submitted Drawings-Final Revision
Site Plan Drawing (Final Version)
1/14/2019
6
07-SITE-820180190-SP-102.pdf
Submitted Drawings-Final Revision
Site Plan Drawing (Final Version)
6/15/2018
3
07-SITE-820180190-SP-102.pdf
Submitted Drawings-Final Revision
Site Plan Drawing (Final Version)
12/11/2018
5
07-SITE-820180190-SP-102.pdf
Submitted Drawings-Final Revision
Site Plan Drawing (Final Version)
9/19/2018
4
07-SITE-820180190-SP-102.pdf
Submitted Drawings-Final Revision
Site Plan Drawing (Final Version)
9/19/2018
4
07-SITE-820180190-SP-103.pdf
Submitted Drawings-Final Revision
Site Plan Drawing (Final Version)
12/11/2018
5
07-SITE-820180190-SP-103.pdf
Submitted Drawings-Final Revision
Site Plan Drawing (Final Version)
6/15/2018
3
07-SITE-820180190-SP-103.pdf
Submitted Drawings-Final Revision
Site Plan Drawing (Final Version)
1/14/2019
6
07-SITE-820180190-SP-103.pdf
Submitted Drawings-Final Revision
Site Plan Drawing (Final Version)
1/14/2019
3
07-SITE-820180190-SP-104.pdf
Submitted Drawings-Final Revision
Site Plan Drawing (Final Version)
12/11/2018
2
07-SITE-820180190-SP-104.pdf
Submitted Drawings-Final Revision
Site Plan Drawing (Final Version)
9/19/2018
1
07-SITE-820180190-SP-104.pdf
Submitted Drawings-Final Revision
Site Plan Drawing (Final Version)
9/19/2018
1
07-SITE-820180190-SP-105.pdf
Submitted Drawings-Final Revision
Site Plan Drawing (Final Version)
12/11/2018
2
07-SITE-820180190-SP-105.pdf
Submitted Drawings-Final Revision
Site Plan Drawing (Final Version)
1/14/2019
3
07-SITE-820180190-SP-105.pdf
Submitted Drawings-Final Revision
Site Plan Drawing (Final Version)
1/14/2019
7
07-SITE-820180190-SP-401.pdf
Submitted Drawings-Final Revision
Site Plan Drawing (Final Version)
12/11/2018
6
07-SITE-820180190-SP-401.pdf
Submitted Drawings-Final Revision
Site Plan Drawing (Final Version)
6/15/2018
3
07-SITE-820180190-SP-401.pdf
Submitted Drawings-Final Revision
Site Plan Drawing (Final Version)
10/9/2018
5
07-SITE-820180190-SP-401.pdf
Submitted Drawings-Final Revision
Site Plan Drawing (Final Version)
6/15/2018
2
07-SITE-820180190-SP-402.pdf
Submitted Drawings-Final Revision
Site Plan Drawing (Final Version)
12/11/2018
4
07-SITE-820180190-SP-402.pdf
Submitted Drawings-Final Revision
Site Plan Drawing (Final Version)
9/19/2018
3
07-SITE-820180190-SP-402.pdf
Submitted Drawings-Final Revision
Site Plan Drawing (Final Version)
1/14/2019
5
07-SITE-820180190-SP-402.pdf
Submitted Drawings-Final Revision
Site Plan Drawing (Final Version)
1/14/2019
2
07-SITE-820180190-SP-403.pdf
Submitted Drawings-Final Revision
Site Plan Drawing (Final Version)
12/11/2018
1
07-SITE-820180190-SP-403.pdf
Submitted Drawings-Final Revision
Site Plan Drawing (Final Version)
12/11/2018
3
07-SITE-820180190-SP-411.pdf
Submitted Drawings-Final Revision
Site Plan Drawing (Final Version)
10/9/2018
2
07-SITE-820180190-SP-411.pdf
Submitted Drawings-Final Revision
Site Plan Drawing (Final Version)
1/14/2019
4
07-SITE-820180190-SP-411.pdf
Submitted Drawings-Final Revision
Site Plan Drawing (Final Version)
1/14/2019
4
07-SITE-820180190-SP-412.pdf
Submitted Drawings-Final Revision
Site Plan Drawing (Final Version)
10/9/2018
2
07-SITE-820180190-SP-412.pdf
Submitted Drawings-Final Revision
Site Plan Drawing (Final Version)
12/11/2018
3
07-SITE-820180190-SP-412.pdf
Submitted Drawings-Final Revision
Site Plan Drawing (Final Version)
12/11/2018
3
07-SITE-820180190-SP-413.pdf
Submitted Drawings-Final Revision
Site Plan Drawing (Final Version)
10/9/2018
2
07-SITE-820180190-SP-413.pdf
Submitted Drawings-Final Revision
Site Plan Drawing (Final Version)
1/14/2019
4
07-SITE-820180190-SP-413.pdf
Submitted Drawings-Final Revision
Site Plan Drawing (Final Version)
1/14/2019
6
07-SITE-820180190-SP-501.pdf
Submitted Drawings-Final Revision
Site Plan Drawing (Final Version)
6/15/2018
3
07-SITE-820180190-SP-501.pdf
Submitted Drawings-Final Revision
Site Plan Drawing (Final Version)
12/11/2018
5
07-SITE-820180190-SP-501.pdf
Submitted Drawings-Final Revision
Site Plan Drawing (Final Version)
9/19/2018
4
07-SITE-820180190-SP-501.pdf
Submitted Drawings-Final Revision
Site Plan Drawing (Final Version)
9/19/2018
4
07-SITE-820180190-SP-502.pdf
Submitted Drawings-Final Revision
Site Plan Drawing (Final Version)
12/11/2018
5
07-SITE-820180190-SP-502.pdf
Submitted Drawings-Final Revision
Site Plan Drawing (Final Version)
6/15/2018
3
07-SITE-820180190-SP-502.pdf
Submitted Drawings-Final Revision
Site Plan Drawing (Final Version)
1/14/2019
6
07-SITE-820180190-SP-502.pdf
Submitted Drawings-Final Revision
Site Plan Drawing (Final Version)
6/15/2018
2
07-SITE-820180190-SP-503.pdf
Submitted Drawings-Final Revision
Site Plan Drawing (Final Version)
12/11/2018
4
07-SITE-820180190-SP-503.pdf
Submitted Drawings-Final Revision
Site Plan Drawing (Final Version)
9/19/2018
3
07-SITE-820180190-SP-503.pdf
Submitted Drawings-Final Revision
Landscape and Lighting Plan Drawing (Final Version)
12/11/2018
5
08-LL-820180190-L1-001.pdf
Submitted Drawings-Final Revision
Landscape and Lighting Plan Drawing (Final Version)
10/9/2018
4
08-LL-820180190-L1-001.pdf
Submitted Drawings-Final Revision
Landscape and Lighting Plan Drawing (Final Version)
1/14/2019
6
08-LL-820180190-L1-001.pdf
Submitted Drawings-Final Revision
Landscape and Lighting Plan Drawing (Final Version)
1/14/2019
1
08-LL-820180190-L1-002.pdf
Submitted Drawings-Final Revision
Landscape and Lighting Plan Drawing (Final Version)
1/14/2019
6
08-LL-820180190-L2-101.pdf
Submitted Drawings-Final Revision
Landscape and Lighting Plan Drawing (Final Version)
10/9/2018
4
08-LL-820180190-L2-101.pdf
Submitted Drawings-Final Revision
Landscape and Lighting Plan Drawing (Final Version)
12/11/2018
5
08-LL-820180190-L2-101.pdf
Submitted Drawings-Final Revision
Landscape and Lighting Plan Drawing (Final Version)
12/11/2018
4
08-LL-820180190-L2-102.pdf
Submitted Drawings-Final Revision
Landscape and Lighting Plan Drawing (Final Version)
9/19/2018
3
08-LL-820180190-L2-102.pdf
Submitted Drawings-Final Revision
Landscape and Lighting Plan Drawing (Final Version)
1/14/2019
5
08-LL-820180190-L2-102.pdf
Submitted Drawings-Final Revision
Landscape and Lighting Plan Drawing (Final Version)
1/14/2019
5
08-LL-820180190-L4-001.pdf
Submitted Drawings-Final Revision
Landscape and Lighting Plan Drawing (Final Version)
9/19/2018
3
08-LL-820180190-L4-001.pdf
Submitted Drawings-Final Revision
Landscape and Lighting Plan Drawing (Final Version)
12/11/2018
4
08-LL-820180190-L4-001.pdf
Submitted Drawings-Final Revision
Landscape and Lighting Plan Drawing (Final Version)
12/11/2018
4
08-LL-820180190-L4-101.pdf
Submitted Drawings-Final Revision
Landscape and Lighting Plan Drawing (Final Version)
9/19/2018
3
08-LL-820180190-L4-101.pdf
Submitted Drawings-Final Revision
Landscape and Lighting Plan Drawing (Final Version)
1/14/2019
5
08-LL-820180190-L4-101.pdf
Submitted Drawings-Final Revision
Landscape and Lighting Plan Drawing (Final Version)
1/14/2019
1
08-LL-820180190-L4-201.pdf
Submitted Drawings-Final Revision
Landscape and Lighting Plan Drawing (Final Version)
1/14/2019
5
08-LL-820180190-L4-301.pdf
Submitted Drawings-Final Revision
Landscape and Lighting Plan Drawing (Final Version)
9/19/2018
3
08-LL-820180190-L4-301.pdf
Submitted Drawings-Final Revision
Landscape and Lighting Plan Drawing (Final Version)
12/11/2018
4
08-LL-820180190-L4-301.pdf
Submitted Drawings-Final Revision
Landscape and Lighting Plan Drawing (Final Version)
12/11/2018
5
08-LL-820180190-L5-101.pdf
Submitted Drawings-Final Revision
Landscape and Lighting Plan Drawing (Final Version)
10/9/2018
4
08-LL-820180190-L5-101.pdf
Submitted Drawings-Final Revision
Landscape and Lighting Plan Drawing (Final Version)
1/14/2019
6
08-LL-820180190-L5-101.pdf
Submitted Drawings-Final Revision
Landscape and Lighting Plan Drawing (Final Version)
1/14/2019
5
08-LL-820180190-L5-102.pdf
Submitted Drawings-Final Revision
Landscape and Lighting Plan Drawing (Final Version)
12/11/2018
4
08-LL-820180190-L5-102.pdf
Submitted Drawings-Final Revision
Landscape and Lighting Plan Drawing (Final Version)
9/19/2018
3
08-LL-820180190-L5-102.pdf
Submitted Drawings-Final Revision
Landscape and Lighting Plan Drawing (Final Version)
9/19/2018
3
08-LL-820180190-L6-101.pdf
Submitted Drawings-Final Revision
Landscape and Lighting Plan Drawing (Final Version)
12/11/2018
4
08-LL-820180190-L6-101.pdf
Submitted Drawings-Final Revision
Landscape and Lighting Plan Drawing (Final Version)
1/14/2019
5
08-LL-820180190-L6-101.pdf
Submitted Drawings-Final Revision
Landscape and Lighting Plan Drawing (Final Version)
1/14/2019
5
08-LL-820180190-L6-301.pdf
Submitted Drawings-Final Revision
Landscape and Lighting Plan Drawing (Final Version)
12/11/2018
4
08-LL-820180190-L6-301.pdf
Submitted Drawings-Final Revision
Landscape and Lighting Plan Drawing (Final Version)
9/19/2018
3
08-LL-820180190-L6-301.pdf
Submitted Drawings-Final Revision
Landscape and Lighting Plan Drawing (Final Version)
9/19/2018
1
08-LL-820180190-PI.pdf
Submitted Drawings-Final Revision
Landscape and Lighting Plan Drawing (Final Version)
1/14/2019
5
08-LL-820180190-SL3.0.pdf
Submitted Drawings-Final Revision
Landscape and Lighting Plan Drawing (Final Version)
10/8/2018
4
08-LL-820180190-SL3.0.pdf
Submitted Drawings-Final Revision
Landscape and Lighting Plan Drawing (Final Version)
10/8/2018
4
08-LL-820180190-SL3.1.pdf
Submitted Drawings-Final Revision
Landscape and Lighting Plan Drawing (Final Version)
10/8/2018
3
08-LL-820180190-SL3.2.pdf
Submitted Drawings-Final Revision
Architectural Drawing (Final Version)
1/14/2019
4
09-ARCH-820180190-A101.pdf
Submitted Drawings-Final Revision
Architectural Drawing (Final Version)
9/19/2018
3
09-ARCH-820180190-A101.pdf
Submitted Drawings-Final Revision
Architectural Drawing (Final Version)
9/19/2018
3
09-ARCH-820180190-A102.pdf
Submitted Drawings-Final Revision
Architectural Drawing (Final Version)
1/14/2019
4
09-ARCH-820180190-A102.pdf
Submitted Drawings-Final Revision
Architectural Drawing (Final Version)
9/19/2018
3
09-ARCH-820180190-A103.pdf
Submitted Drawings-Final Revision
Architectural Drawing (Final Version)
9/19/2018
3
09-ARCH-820180190-A104.pdf
Submitted Drawings-Final Revision
Architectural Drawing (Final Version)
9/19/2018
3
09-ARCH-820180190-A201.pdf
Submitted Drawings-Final Revision
Architectural Drawing (Final Version)
1/14/2019
4
09-ARCH-820180190-A201.pdf
Submitted Drawings-Final Revision
Architectural Drawing (Final Version)
1/14/2019
4
09-ARCH-820180190-A202.pdf
Submitted Drawings-Final Revision
Architectural Drawing (Final Version)
9/19/2018
3
09-ARCH-820180190-A202.pdf
Submitted Drawings-Final Revision
Architectural Drawing (Final Version)
9/19/2018
3
09-ARCH-820180190-A203.pdf
Submitted Drawings-Final Revision
Architectural Drawing (Final Version)
1/14/2019
4
09-ARCH-820180190-A203.pdf
Submitted Drawings-Final Revision
Architectural Drawing (Final Version)
9/19/2018
3
09-ARCH-820180190-A204.pdf
Submitted Drawings-Final Revision
Architectural Drawing (Final Version)
9/19/2018
3
09-ARCH-820180190-A205.pdf
Submitted Drawings-Final Revision
Architectural Drawing (Final Version)
9/19/2018
3
09-ARCH-820180190-A300.pdf
Submitted Drawings-Final Revision
Architectural Drawing (Final Version)
9/19/2018
3
09-ARCH-820180190-A301.pdf
Submitted Drawings-Final Revision
Architectural Drawing (Final Version)
9/19/2018
3
09-ARCH-820180190-A302.pdf
Submitted Drawings-Final Revision
Architectural Drawing (Final Version)
1/14/2019
4
09-ARCH-820180190-A302.pdf
Submitted Drawings-Final Revision
Architectural Drawing (Final Version)
9/19/2018
3
09-ARCH-820180190-A303.pdf
Submitted Drawings-Final Revision
Architectural Drawing (Final Version)
9/19/2018
1
09-ARCH-820180190-A310.pdf
Submitted Drawings-Final Revision
Architectural Drawing (Final Version)
1/14/2019
2
09-ARCH-820180190-A310.pdf
Submitted Drawings-Final Revision
Architectural Drawing (Final Version)
1/14/2019
2
09-ARCH-820180190-A311.pdf
Submitted Drawings-Final Revision
Architectural Drawing (Final Version)
9/19/2018
1
09-ARCH-820180190-A311.pdf
Submitted Drawings-Final Revision
Architectural Drawing (Final Version)
9/19/2018
1
09-ARCH-820180190-A312.pdf
Submitted Drawings-Final Revision
Architectural Drawing (Final Version)
1/14/2019
2
09-ARCH-820180190-A312.pdf
Submitted Drawings-Final Revision
Architectural Drawing (Final Version)
1/14/2019
2
09-ARCH-820180190-A313.pdf
Submitted Drawings-Final Revision
Architectural Drawing (Final Version)
9/19/2018
1
09-ARCH-820180190-A313.pdf
Submitted Drawings-Final Revision
Architectural Drawing (Final Version)
9/19/2018
1
09-ARCH-820180190-A314.pdf
Submitted Drawings-Final Revision
Architectural Drawing (Final Version)
1/14/2019
2
09-ARCH-820180190-A314.pdf
Submitted Drawings-Final Revision
Architectural Drawing (Final Version)
1/14/2019
2
09-ARCH-820180190-A315.pdf
Submitted Drawings-Final Revision
Architectural Drawing (Final Version)
9/19/2018
1
09-ARCH-820180190-A315.pdf
Submitted Drawings-Final Revision
Architectural Drawing (Final Version)
9/19/2018
1
09-ARCH-820180190-A316.pdf
Submitted Drawings-Final Revision
Architectural Drawing (Final Version)
1/14/2019
2
09-ARCH-820180190-A316.pdf
Submitted Drawings-Final Revision
Architectural Drawing (Final Version)
1/14/2019
2
09-ARCH-820180190-A317.pdf
Submitted Drawings-Final Revision
Architectural Drawing (Final Version)
9/19/2018
1
09-ARCH-820180190-A317.pdf
Submitted Drawings-Final Revision
Architectural Drawing (Final Version)
9/19/2018
1
09-ARCH-820180190-A318.pdf
Submitted Drawings-Final Revision
Architectural Drawing (Final Version)
1/14/2019
2
09-ARCH-820180190-A318.pdf
Submitted Drawings-Final Revision
Architectural Drawing (Final Version)
1/14/2019
2
09-ARCH-820180190-A319.pdf
Submitted Drawings-Final Revision
Architectural Drawing (Final Version)
9/19/2018
1
09-ARCH-820180190-A319.pdf
Submitted Drawings-Final Revision
Architectural Drawing (Final Version)
9/19/2018
1
09-ARCH-820180190-A320.pdf
Submitted Drawings-Final Revision
Architectural Drawing (Final Version)
1/14/2019
2
09-ARCH-820180190-A320.pdf
Submitted Drawings-Final Revision
Architectural Drawing (Final Version)
1/14/2019
2
09-ARCH-820180190-A321.pdf
Submitted Drawings-Final Revision
Architectural Drawing (Final Version)
9/19/2018
1
09-ARCH-820180190-A321.pdf
Submitted Drawings-Final Revision
Architectural Drawing (Final Version)
1/14/2019
1
09-ARCH-820180190-A322.pdf
Submitted Drawings-Final Revision
Forest Conservation Plan Drawing (Final Version)
1/14/2019
5
10-FCP-820180190-FCP-1.pdf
Submitted Drawings-Final Revision
Forest Conservation Plan Drawing (Final Version)
2/8/2019
6
10-FCP-820180190-FCP-1.pdf
Submitted Drawings-Final Revision
Forest Conservation Plan Drawing (Final Version)
9/19/2018
3
10-FCP-820180190-FCP-1.pdf
Submitted Drawings-Final Revision
Forest Conservation Plan Drawing (Final Version)
12/11/2018
4
10-FCP-820180190-FCP-1.pdf
Submitted Drawings-Final Revision
Forest Conservation Plan Drawing (Final Version)
12/11/2018
5
10-FCP-820180190-FCP-2.pdf
Submitted Drawings-Final Revision
Forest Conservation Plan Drawing (Final Version)
2/8/2019
7
10-FCP-820180190-FCP-2.pdf
Submitted Drawings-Final Revision
Forest Conservation Plan Drawing (Final Version)
10/8/2018
4
10-FCP-820180190-FCP-2.pdf
Submitted Drawings-Final Revision
Forest Conservation Plan Drawing (Final Version)
1/14/2019
6
10-FCP-820180190-FCP-2.pdf
Submitted Drawings-Final Revision
Forest Conservation Plan Drawing (Final Version)
1/14/2019
4
10-FCP-820180190-FCP-3.pdf
Submitted Drawings-Final Revision
Forest Conservation Plan Drawing (Final Version)
10/8/2018
2
10-FCP-820180190-FCP-3.pdf
Submitted Drawings-Final Revision
Forest Conservation Plan Drawing (Final Version)
12/11/2018
3
10-FCP-820180190-FCP-3.pdf
Submitted Support Drawings
Submitted Support Drawings
Stormwater Management Concept Plan
1/14/2019
1
12-SWM-820180190-001.pdf
Submitted Support Drawings
Stormwater Management Concept Plan
1/14/2019
1
12-SWM-820180190-002.pdf
Submitted Support Drawings
Stormwater Management Concept Plan
1/14/2019
1
12-SWM-820180190-003.pdf
Submitted Support Drawings
Stormwater Management Concept Plan
1/14/2019
1
12-SWM-820180190-004.pdf
Submitted Support Drawings
Stormwater Management Concept Plan
1/14/2019
1
12-SWM-820180190-005.pdf
Submitted Support Drawings
Stormwater Management Concept Plan
1/14/2019
1
12-SWM-820180190-006.pdf
Submitted Support Drawings
Stormwater Management Concept Plan
5/11/2018
2
12-SWM-820180190-SWM-1.pdf
Submitted Support Drawings
Stormwater Management Concept Plan
9/19/2018
3
12-SWM-820180190-SWM-1.pdf
Submitted Support Drawings
Stormwater Management Concept Plan
1/14/2019
4
12-SWM-820180190-SWM-1.pdf
Submitted Support Drawings
Stormwater Management Concept Plan
1/14/2019
4
12-SWM-820180190-SWM-2.pdf
Submitted Support Drawings
Stormwater Management Concept Plan
9/19/2018
3
12-SWM-820180190-SWM-2.pdf
Submitted Support Drawings
Stormwater Management Concept Plan
5/11/2018
2
12-SWM-820180190-SWM-2.pdf
Submitted Support Drawings
Fire Department Access Plan
5/11/2018
2
13-FDA-820180190.pdf
Submitted Support Drawings
Fire Department Access Plan
1/14/2019
6
13-FDA-820180190.pdf
Submitted Support Drawings
Storm Drain Analysis
5/11/2018
1
14-SD-820180190.pdf
Submitted Support Drawings
Concept Sediment Control Plan
5/11/2018
1
15-SED-820180190.pdf
Submitted Support Drawings
Color-Coded Utility Plan
5/11/2018
2
19-UTIL-820180190.pdf
Submitted Support Drawings
Color-Coded Utility Plan
1/14/2019
6
19-UTIL-820180190.pdf
Submitted Support Drawings
Local Area Drawing
5/11/2018
2
20-LOCAL-820180190.pdf
Submitted Support Drawings
Additional Item
5/11/2018
2
32-EXIST-820180190.pdf
Submitted Support Drawings
Additional Item
1/14/2019
5
32-EXIST-820180190.pdf
Submitted Support Drawings
Additional Item
1/15/2019
1
32-OSD-820180190.pdf
Submitted Support Drawings
Additional Item
1/14/2019
1
32-PHASE-820180190.pdf
Submitted Support Drawings
Additional Item
1/14/2019
2
32-REC-820180190.pdf
Submitted Support Drawings
Sign Posting Information
1/14/2019
2
32-SIGN-820180190.pdf
Submitted Support Drawings
Additional Item
1/14/2019
3
32-TREE-820180190.pdf
Submitted Supporting Documents
Submitted Supporting Documents
Statement of Justification
5/11/2018
2
01-SOJ-820180190.pdf
Submitted Supporting Documents
Statement of Justification
6/15/2018
3
01-SOJ-820180190.pdf
Submitted Supporting Documents
Statement of Justification
1/14/2019
5
01-SOJ-820180190.pdf
Submitted Supporting Documents
Certificate of Compliance
4/20/2018
1
02-COC-820180190.pdf
Submitted Supporting Documents
Notice List
4/20/2018
1
03-NLIST-820180190.xlsx
Submitted Supporting Documents
Application Notice Letter
5/11/2018
2
04-NLTR-820180190.pdf
Submitted Supporting Documents
Pre-submission Meeting Info
4/20/2018
1
05-PMTG-820180190.pdf
Submitted Supporting Documents
Verification of Sign Posting
5/11/2018
1
06-POST-120170170.pdf
Submitted Supporting Documents
Justification for Tree Variance
5/11/2018
1
10-VAR-820180190.pdf
Submitted Supporting Documents
Justification for Tree Variance
1/14/2019
3
10-VAR-820180190.pdf
Submitted Supporting Documents
Other Document
1/14/2019
1
12-SWMCAL-820180190.pdf
Submitted Supporting Documents
Stormwater Management Approval Letter
2/28/2019
1
12-SWML-820180190.pdf
Submitted Supporting Documents
Other Document
6/15/2018
2
16-TIS(TS)-820180190.pdf
Submitted Supporting Documents
Other Document
10/9/2018
4
16-TIS(TS)-820180190.pdf
Submitted Supporting Documents
Other Document
4/20/2018
1
16-TIS(TS)-820180190.pdf
Submitted Supporting Documents
Sight Distance Evaluation Form
5/11/2018
2
17-SIGHT-820180190.pdf
Submitted Supporting Documents
Additional Item
1/14/2019
1
32-ARBORISTREPORT-820180190.pdf
Submitted Supporting Documents
Additional Item
7/17/2018
1
32-DRCSummary-820180190.pdf
Submitted Supporting Documents
Additional Item
1/14/2019
1
32-SWMINFILTRATION-820180190.pdf
Submitted Supporting Documents
Other Document
12/12/2018
1
820180190-DPS-RPP.pdf
Submitted Supporting Documents
Other Document
2/14/2019
1
DHCALetter02_14_2019-820180190.pdf